New Plymouth District Council
PrintSiteMapContact

Projects

You are here > Home > Living in New Plymouth > Projects > Todd Energy Aquatic Centre Redevelopment
  • Home
  • A-Z of Council Services
  • The Council & its People
  • Council Documents
  • Living in New Plymouth
    • Community Development
    • Community Directory
    • Projects
    • Rates
    • Tangata Whenua
    • Youth
    • About New Plymouth
    • Sustainable District
  • Have Your Say
  • Visiting New Plymouth
Last Updated: 28/11/2007
- Bookmark this Page
- Rate this Page
- Report an Error

Search
Download Adobe Reader PDF
 

Todd Energy Aquatic Centre Redevelopment

Aerial view of the current aquatic centre taken in 2006. The Todd Energy Aquatic Centre revamp will see a brighter, tidier and more exciting attraction for users.

The project will see the removal of the outdoor water slides at the eastern end of the complex, and the construction of two water slides outside the western end of the indoor pool building. They will be fully linked to the indoor pool and so be available for use all year round.

The new hydroslides will be the tallest in New Zealand. Users will enter and exit them from inside the building, with the exit chutes installed between the main pool and the sauna.

Already we have brighten the indoor pools’ area through the use of light colours and modern skylights, as well as new water features and fresher surrounds.

The main changing rooms will be revamped with new surfaces and facilities, cracks and slumps in the outdoor paving will be repaired, and maintenance work on the terraces and outdoor lights may be undertaken.

In addition, a new roof will be installed on the indoor pools’ building.

  • Design of the Todd Energy Aquatic Centre redevelopment (Two pages 2MB PDF)

Timeline

January - March 2008The new hydroslide tower at the Todd Energy Aquatic Centre.

  • Re-theme the inside pool surroundings.
  • Replace the roof of the indoor pool building.

  
March - October 2008

  • Install new hydroslides.
  • Renew the layout, fittings and surfacing materials within the men’s and woman’s change rooms.
  • Renew some of the outdoor pool surrounds landscape.
  • Remove current hydro-slide from the site.                                                                                         

Completion date: Before Labour Weekend 2008.

     A new inflatable ride at the Aquatic Centre.      The hydroslide tunnel outside the nearly completed outside tower.       The turbo slide for the new hydroslide being craned into place.

Related links

  • Todd Energy Aquatic Centre

Subscribe to RSS feeds: http://www.newplymouthnz.com/RSS/Projects.xml
 

Contact Us

Address Icon. New Plymouth District Council, Civic Centre, Liardet St Postal Icon. Private Bag 2025 New Plymouth New Zealand 4342
Phone Icon. 06-759 6060 Fax Icon. 06-759 6072 Email Icon.  Email Contact Us Icon.  Contact Us Form Disclaimer Icon.  Terms and Conditions RSS feed icon.  Find out more about RSS
  • Home
  • A-Z of Council Services
  • The Council & its People
  • Council Documents
  • Living in New Plymouth
  • Have Your Say
  • Visiting New Plymouth