Maintenance

Roads | Purchasing Unformed Legal Roads | Road Closures | State Highways

A contractor resealing a road in New Plymouth. Footpath cracked and unsafe? Road sign damaged? Pot holes?

If you notice something to do with the roads or footpaths that needs maintenance please let us know. This includes:

  • Broken or flickering street lights.
  • Loose seal which may cause damage to vehicles or an accident.
  • Faulty traffic lights.
  • Faded road markings.
  • Broken glass or debris on the road.
  • Overhanging branches blocking footpaths.
  • Contact us form

NPDC is responsible for the maintenance of local roads. This includes streetlights, cycle lanes / cycle ways, footpaths, seating and other street furniture, pedestrian crossings and ramps, road signs, road markings, repair and maintenance of existing kerb and channel, street cleaning, traffic signals, and service covers (e.g. manhole covers, grates).

The clean up of spillages such as diesel on local roads, crash response and debris cleanup is also done by the council.

Road Works

This section is updated monthly.
Last update: 5 May 2008
Next update: 2 June 2008

  • Projects under way
  • Projects coming up
  • Recently completed road works

For more information about roading projects please contact us on 06-759 6060 or use our contact us form.

  • Contact usReturn to top

Projects under way


CBD camera maintenance

Location: New Plymouth, Waitara and Inglewood CBDs
Contractor: Obertech Security
Start date: 2005
End date: 26/01/2009

Road markings 

Location: District wide
Contractor: Independent Road Markers
Start date: 2006
End date: 26/06/2008

Rural road general maintenance 2005-2008

Location: All rural areas
Contractor: Fulton Hogan (took over from 1 July 2006)
Start date: 2006
End date: 01/07/2008

Urban road general maintenance

Location: All townships
Contractor: Inframax Construction
Start date: 2006
End date: 27/06/2009

Traffic signal maintenance

Location: District wide
Contractor: Wells Instrument and Electrical Ltd
Start date: 2006
End date: 30/06/2009Return to top

Rural road reseals

Location: District wide
Contractor: Works Infrastructure Ltd / Downer EDI Works Ltd
Start date: 18/01/2007
End date: 15/06/2008

Uruiti Rd tunnel repairs (road position =  9.7km from intersection)

Location: Uruiti Tunnel
Contractor: Hampton Contractors
Start date: 20/06/2007
End date: 30/06/2008

Kent Rd seal widening and minor safety repairs

Location: SHW 3 intersection + 1.5km up Kent Rd
Contractor: Hurlstone Earthmoving Ltd
Start date: 11/10/2007
End date: 30/05/2008
Return to top

CBD cleaning

Location: New Plymouth, Waitara and Inglewood CBDs
Contractor: Chemwash Taranaki Ltd
Start date: 2008
End date: 2010

Mangaonga Rd Culvert Replacement

Location: Mangaonga Rd
Contractor: Hurlstone Earthmoving Ltd
Start date: June 2008
End date: TBA

Mangorei Rd rehabilitation project 2007/2008

Location: Mangorei Rd from Cumberland to Karaka 
Contractor: Taranaki Civil Construction Ltd
Start date: 10/01/2008
End date: 31/05/2008

Corbett Rd intersection improvements

Location: Corbett Rd intersection with Manutahi Rd
Contractor: Downer EDI Works Ltd
Start date: 25/03/2008
End date: 31/05/2008Return to top

Uruiti Rd slip repair

Location: South of Putts Rd
Contractor: Burgess and Crowley Civil Ltd
End date: 30/06/2008

Egmont Rd

Location: 13.8km-15.4km Egmont Rd and 19.1km-21.0km Egmont Rd
Contractor: Inframax Construction Ltd
End date: 30/05/2008

Kotare area under slip repairs

Location: Waitaanga Rd - 2.6km east of Okau Rd
Contractor: Taranaki Civil Construction Ltd
End date: 03/06/2008

Carrington Rd replacement of existing culvert #49

Location: Carrington Rd (road position = 15.5km)
Contractor: Taranaki Civil Construction Ltd
Start date: 14/04/2008
End date: 01/05/2008 (remaining work to be completed in November 2008)

Carrington Rd bridge replacement

Location: Carrington Rd (road position = 22.5km)
Contractor: Whitaker Civil Engineering
Start date: 14/04/2008
End date: 31/08/2008

Mohakatino Rd

Contractor: Downer EDI Works Ltd
Start date: 28/04/2008
End date: 30/06/2008

Frankley Rd kerb and channel (stage one)

Location: From Barclay Close to Tukapa St (for 400m)
Contractor: Taranaki Civil Construction Ltd
Start date: 01/06/2008
End date: 01/07/2008Return to top

Projects coming up


Dawson St

Location: Frankley Rd to Vivian St
Contractor: Downer EDI Works
Start date: TBC

Carrington Rd Underslip Repairs

Location: Carrington Rd
Contractor: Whitaker Engineering
Start date: TBA
End date: TBA

Recently completed road works



Slurry sealing of urban footpaths

Location: All townships
Contractor:
Downer EDI Works Ltd
Start date: 13/09/2007
End date: 10/03/2008 + 30 days

Mill Rd

Location: Lower end of Mill Rd
Contractor: Civilscape Ltd
Start date: 10/01/2008
End date: 30/04/2008

Second coat seals

Location: District wide
Contractor: Downer EDI Works Ltd
Start date: 29/01/2008
End date: 31/03/2008

Resealing of urban streets

Location: All townships (now in New Plymouth) 
Contractor: Ireland Roading and Construction Ltd
Start date: 27/11/2007
End date: 28/03/2008

Related links

  • State highway maintenance responsibilities

Return to top

 

Contact Us

Address Icon. New Plymouth District Council, Civic Centre, Liardet St Postal Icon. Private Bag 2025 New Plymouth New Zealand 4342
Phone Icon. 06-759 6060 Fax Icon. 06-759 6072 Email Icon.  Email Contact Us Icon.  Contact Us Form Disclaimer Icon.  Terms and Conditions
  • Home
  • A-Z of Council Services
  • The Council & its People
  • Council Documents
  • Living in New Plymouth
  • Have Your Say
  • Visiting New Plymouth